Public utilities

Public utilities, Specials
Beach pavilion Reuring: new icon on Hoorn city beach
The construction of Beach pavilion Reuring on Hoorn's city beach has started with the driving of a pile. This contemporary pavilion, inspired by culturally historic wooden dike warehouses, offers a stunning view of the city center and the open water.

Public utilities
Lely agrotech company expansion
The Lely Industries company is expanding substantially. This process involves building new offices and a production hall. The extension of the premises is on the site where the former production halls, dating back to the 1960s, once stood. The surface area covered is 33,000 square metres in total. 8,000 square metres of this will be devoted to office space.

Public utilities
‘Children’s centre’ and gymnasium
On the Buitenroede in Avenhorn a children's’ centre will be opening in 2021, accommodating the Jozefschool, Overhaal and De Ieveling primary schools. It will also be home to the Berend Botje crèche. On 6 April, we drove the first of a total of 236 piles that will be used for the foundations.

Public utilities
New-build project: Cor Voet business premises
Work is being carried out on new premises for game and poultry processor Cor Voet at Industriegebied Bombraak in Oostzaan. The business is currently using premises on Noordeinde, on the other side of Oostzaan, but is bursting at the seams: time to move somewhere new.

Public utilities
KFC restaurant and parking lots
In Amsterdam Osdorp, we have taken care of the foundation for a new KFC restaurant. It involves a prefab foundation as it had to be placed partly above the water. Mounting went fast and prefab elements were very qualified for a positioning above the water.

Public utilities, Renovation and expansion
Expansion company hall in Weesp
Sun Test Systems is getting too big and in order to cope with this, the company hall has been expanded. Under the authority of Van Wijnen Weesp, we are applying a total foundation package including piling activities, prefab foundation beams, prefab hollow-core slabs, prefab walkways and a poured company floor.

Public utilities
Superfast 5D combo
More or less in the backyard of Hecon, a new corporate building is built under the authority of Peereboom Touringcars. The 5D construction concept guarantees a short construction period and the process can be followed on the webcam. Early May, Vroom has inserted the foundation piles and mounted the foundation beams. Completion is scheduled for this year’s summer.

Public utilities
New housing project Frederikkazerne army building
Heijmans Utiliteitsbouw is realizing a new housing project at the Frederikskazerne in The Hague and will maintain this building under the authority of Dienst Vastgoed Defensie, part of Ministerie van Defensie. Vroom has realized the total foundation construction for this project.

Public utilities
LEAN under high tension
Vroom Foundation Technology is working as a constructional team for Hecon Bouwgroup in order to realize the foundation of two new corporate buildings for two transport companies. The execution of the projects will, for the greater part, take place according to the LEAN principles. The new housing project will be realized on Westeinde in Oostzaan next to a distribution station including the power transmission towers for electricity facilities.

Public utilities
Lidl Supermarket
More and more often, Vroom Betonbouw takes care of the total foundation package: from groundwork, dimensioning and piling to all foundation elements in prefab concrete such as foundation beams, foundation blocks and ground-level floors. And for this particular project, also the walls and columns have been set up in prefab concrete.