Beach café Het Strand

91 piles690 m¹ foundation

A very fast construction method was necessary to make sure that beach café Het Strand could be taken in use again founded on new piles before the opening of the season. We have applied prefab piles, a prefab foundation and prefab floors.

As the sand layer on the coastline is much thicker than just on the mainland, the piles have been pre-drilled in order to pierce the sand layer followed by the piles being driven through the upper sand layer and further until a sand layer with sufficient bearing capacity.

Dismountable foundation and floors

A requirement for building on coastlines is that the construction project has to be able to be made undone. Using prefab foundation beams is an advantage as they can be mounted in such a way that they can simply be dismounted. The floors have been realized as hollow core-slabs which are prefab elements that can be mounted or dismounted fast.

Opening deadline

As we were allowed to build only short before the opening of the season, there was a short construction period. In order to use this period well, we took optimal use of prefab products. The piles as well as the foundation beams and the floors have been realized as prefab elements. The piles have been inserted within 5 days as the foundation beams as well as the floor elements have been applied within 1 day.

Just in time

To have all elements delivered, we have used the just in time delivery method. Exactly at the moment when elements had to be processed, they were delivered on the building site. As a result, not much supplies have been present on the building site as sufficient space remained in order to be able to process the elements well.

Beach café Het Strand
Beach café Het Strand
Beach café Het Strand
Beach café Het Strand
Beach café Het Strand
Beach café Het Strand
Beach café Het Strand
Beach café Het Strand

Can we help you with your project?

We are happy to answer your questions! Would you like to know more about our projects, products and/or services? Please contact Sandro Pronk

Sandro Pronk

Share project:

Realization
06-02-2015 to 13-03-2015
Location
Katwijk aan Zee
Client
Appel Beton Opmeer BV
Contractor
ERA Contour
Architect
Bouwkundige Technieken Waals
 
Dick Reijnders
Project Manager