07-12-2024

Holidays

Vroom Funderingstechnieken and Vroom Betonbouw will be closed from 23 December 2024 to 7 January 2025. This period of rest and recovery is an important moment for the team to enjoy the holidays with family and friends.

Continuous development and training

After the holidays, Vroom will begin the annual collective training days on 6 and 7 January 2025. These days focus on enhancing knowledge and skills within our team, covering topics such as safety, digital skills, and job-specific training.

Limited availability

During this period, Vroom will be limitedly reachable by phone. Regular business operations will resume on Wednesday, 8 January 2025, when we will be ready to start the new year with fresh energy and a well-filled order portfolio.

Vroom wishes everyone a Merry Christmas and a prosperous 2025!

Share article:

More posts

Training days 2026
09-01-2026

Training days 2026

On Monday, January 5, we kicked off the new year with the annual Training Days. More than 200 employees of Vroom, Beton- en Vlechtbedrijf Hadek, and VDB Funderingstechnieken gathered from 7:00 a.m. at Hotel Van der Valk in Oostzaan. After the welcome speech, the inspiring address by Peter Vroom about […]
Board changes
08-01-2026

Board changes

On Monday 5 January, all more than 200 employees of Vroom, Beton- en Vlechtbedrijf Hadek and VDB Funderingstechnieken attended the first Training Day, which was held at Hotel Van der Valk in Oostzaan. Peter Vroom opened the day with a warm welcome and his best wishes for 2026, after which […]
Certification of pile systems DPA and DPA-PLUS
18-12-2025

Certification of pile systems DPA and DPA-PLUS

Vroom Funderingstechnieken and Van ‘t Hek have jointly certified the pile systems DPA and DPA-PLUS with a self-declaration in accordance with NPR 7201. This process took over two years and involved load tests in which test piles, equipped with extensometers, were loaded to failure. In addition, an expert committee appointed […]
To top