30-06-2025

NEN 9997-1 modifies screw pile design

NEN 9997-1 has been revised, which has major implications for the design of displacement screw piles.

Due to the reduction of the pile class factor αₚ, the calculated capacity of the pile tip significantly decreases in many cases. Fortunately, a self-declaration published by NEN applies to our DPA screw piles and DPA-PLUS screw piles, allowing deviations from the standard values.

Research by Van ’t Hek Groep and Vroom Funderingstechnieken confirms that this reduction is justified, but also shows that a well-manufactured DPA or DPA-PLUS screw pile derives a much higher shaft capacity than previously assumed. These innovative pile systems therefore offer a reliable and powerful alternative.

Also view the 3D animations of these pile systems:
DPA screw piles
DPA-PLUS screw piles
DPA-combi screw piles

Share article:

More posts

From outside to inside: the career of Danny Dokman
26-06-2026

From outside to inside: the career of Danny Dokman

Danny Dokman’s career began in 2007 outside on construction sites. In the years that followed, he became broadly deployable: he worked with the concrete and grout pump and moved from the shovel to become an operator on the foundation machine. Eventually, he continued to grow into the role of junior […]
First Vroom foundation system in the National Environmental Database
12-05-2026

First Vroom foundation system in the National Environmental Database

The construction sector is visibly changing. Whereas sustainability was for many years mainly expressed as an ambition, there is now an increasing demand for demonstrable substantiation. Clients, architects and design consultancies are paying closer attention throughout the entire process of design, procurement and execution to the environmental performance of applied […]
This is what our clients say
SAMSUNG CSC
28-04-2026

This is what our clients say

We continuously measure the satisfaction of our customers. We do this through a weekly survey that is sent to clients and site managers whose project was recently completed by us. We ask them to rate us with a grade on the following aspects: How do you rate us overall? How […]
To top