At this location, Vroom Betonbouw is assembling the precast foundation beams onto the previously installed DPA screw piles by Vroom Funderingstechnieken. This approach results in a more efficient construction method and significantly saves time at the construction site. As a result, we can build faster than with traditional concrete construction, which is particularly crucial in these times of a major housing crisis.
Our collaboration with Appel Beton Opmeer ensures a smooth and efficient construction process, with no compromises made on the quality of the final product. Discover how we are making a positive impact on the construction sector and contributing to the reduction of the housing crisis. Together, we are creating fast and affordable homes.
A specifically constructed causeway was utilized for the transport of the foundation machinery and materials. It was not feasible to utilize the existing bridge for transportation due to the weight of the used foundation machinery.